Engineer mobilised to Korea for project bound for Canada

Hhi-yard

Our engineer was mobilized in eary January to install and commission several explosion proof bridge cranes. The cranes will be on modules that will form the topsides for a large gravity based structure. The structure is bound for the Canadian offshore sector.

Site work will be split between the Korean yard and the fabrication yard in Canada.

Date: 6th January 2016