Choose Language:

en English

+44 (0) 1384 484 811

Shell Penguins FPSO Material Handling Package Award

Shell Penguins FPSO will extend the life of the Penguins Oil and Gas Field in the North Sea by 20 years. JBC received a PO from an engineering house in the Philippines for a material handling package that includes a range of spark-proof manual trolley hoists, davits, floor trolleys, beam clamps.