Shell Penguins FPSO will extend the life of the Penguins Oil and Gas Field in the North Sea by 20 years. JBC received a PO from an engineering house in the Philippines for a material handling package that includes a range of spark-proof manual trolley hoists, davits, floor trolleys, beam clamps.